Interim Products
The GLMRIS Study Team is generating intermediate products throughout the study process. Many of these reports will be created from the data-gathering phase, and include items such as an ANS Inventory and ANS Control Methodologies; Commercial Cargo, Passenger, and Recreational Boating surveys; as well as the commercial and recreational valuation of the Great Lakes and Mississippi River fisheries. If the study team assesses that effective action to reduce ANS transfer risk may be available before the full study is complete, interim measures may be recommended for further action. All such interim products or reports will be subject to appropriate levels of technical and/or agency review.
- GLMRIS - Brandon Road Shipper & Carrier Surveys Fact Sheet 168 KB
- GLMRIS - Brandon Road, Environmental Impact Statement, Scoping Summary Report 1.2 MB
- GLMRIS - Brandon Road, Feasibility Study, Project Management Plan 3.3 MB
- MAP-21 90-Day Interim Report Released to Congress 329 KB
- Focus Area 2 Aquatic Pathways Assessment Reports 284 KB
- Treaty Rights and Subsistence Fishing in the U.S. Waters of the Great Lakes, Upper Mississippi River and Ohio River Basins 11.3 MB
- Pro-Fishing Tournaments in the Great Lakes, Upper Mississippi River and Ohio River Basins 643 KB
- Commercial Fisheries Baseline Economic Assessment 2.7 MB
- ANS Control Paper 267 KB
- ANS Control Screening 244 KB
- Baseline Assessment of Cargo Traffic on the CAWS 3.6 MB
- Memorandum for Record: Cargo Traffic Q&A's – Commercial Cargo Report Call-In 98 KB
- Baseline Assessment of Non-Cargo CAWS Traffic Report 927 KB
- NEPA Scoping Summary Report 1.4 MB
- Aquatic Nuisance Species White Paper 1.2 MB
- Other Pathways Preliminary Risk Characterization Report 11 MB
- Project Management Plan for the Great Lakes and Mississippi River Basin Interbasin Feasibility Study 2.3 MB