GLMRIS: Great Lakes and Mississippi River Interbasin Study

Public Comments on the Draft GLMRIS-BR Report

USACE solicited public comment on the Great Lakes and Mississippi River Interbasin Study – Brandon Road Draft Integrated Feasibility Study and Environmental Impact Statement – Will County, Illinois (Draft GLMRIS-BR Report). Comments were received by mail, hand delivery, via an online comment form, or orally at one of the four public meetings. Comments on the Draft GLMRIS-BR Report were received from August 7, 2017, through December 8, 2017.

Campaigns – USACE received comments via letter campaign. Comments received via campaign are available separately.

View Public Comments
Public comments received during the comment period can be viewed below.

ID 2 3 4 5 6

This website includes public comments received through oral testimony at public meetings and written comments received via email and postal mail by the public. No effort has been made to validate the accuracy of these comments, which reflect the individual views and opinions of the commenters and do not necessarily reflect the views and opinions of the U.S. Army Corps of Engineers, the U.S. Army, the Department of Defense, or the U.S. Government.

Follow Us Facebook Twitter